Gold Member Since 2013
Audited Supplier
Sichuan Neijiang Artistic Fountain Factory

Dam, River Dam, Dam Project manufacturer / supplier in China, offering River Dam Project Contractor Dam, Villa Water Fountain Musical Bubbling Fountain, Musical Dance Fountain Lake and so on.

(/ )

Supplier Homepage Product River Lake Dam Construction River Dam Project Contractor Dam

River Dam Project Contractor Dam

FOB Price: Get Latest Price
Min. Order: 1 Set
Production Capacity: 2 Sets Per Month
Transport Package: Carton
Payment Terms: L/C, T/T, Western Union

Request a custom order and have something just for you!

Send Customized Request
Product Catalog
Bridge Waterfall Complex Fountain
4 Products
Content
Product Image
Product Name
FOB Price
Port
Basic Info
  • Model NO.: AF-001
  • Project: Dam for River and Lake
  • Service: One-Stop Construction Dam Service
  • Specification: first grade
  • Type: Dam Project Supplier
  • Project Type: Dam with Waterscape
  • Trademark: art fountain
  • Origin: China
Product Description
River and Lake Dam Project Supplier,  Professional Dam project contractor
We can combine dam with waterscapes, make the environment more beautiful.
  • Sichuan Neijiang Artistic Fountain Factory is engaged in the manufacture of various fountains, water features  and construction area of River Dam and Lake Dam project.
  • We provide turn-key project service, including dam design, production, installation, regulation, customer training and after sales service.
  • We have built project shows in Saudi Arabia, Vietnam, Malaysia, Tajikistan, etc
River Dam Project Contractor Dam
Factory Information
 
Factory NameSichuan Neijiang Artistic Fountain Factory
Business TypeFactory & Trading
Service RangeFountain Design, Manufacturing, On-site Installation & Aftersales Services
Factory LocationSichuan,China (Mainland)
CetificationsISO 9001:2008; CE; Audited by SGS; BV
Main MarketsGlobal
Oversea ProjectsExported & Built Fountains In KSA, Vetinam, Tajikistan, Pakistan, Malaysia, etc.
Supply Ability 100 Sets per Year
Fountain Payment TermsT/T, L/C
Fountain Delivery time10 - 25 Days
Fountain TypeRemote Control / Music Control / Program Control / Manal Control
Fountain Warranty12months Free Warranty
Fountain Nozzle MaterialStainless Steel 304
Fountain Pipe MaterialStainless Steel 304
Pump MaterialStainless Steel 304 / Cast-iron
Underwater Lamp RGB Underwater Light, LED24V/5W/12W/18W/36W, Stainless Steel 304 Shell
Voltage220V/380V-50Hz (Usually) / Customize according to customer's fountain site situation
PackagingWooden Case
Minimum Order Quantity1 Set

Why should build a dam?
It not only protects our environment,
but also makes the city more beautiful.
 
Dams, rivers and channels is to intercept the water to raise the water level or water retaining structures regulate traffic. It can form a reservoir, raising the water level, runoff regulation, centralized head, for flood control, water supply, irrigation, hydropower, improve shipping. Adjustment of river regime, the river bed regulation shore protection structures, also known as the dam, such as groins, along the dam and potential dam.
 
Dam site
 
One of the best places for the construction of the dam is a narrow part of the deep valley; the valley sides can then as a natural wall. The main function of the dam structure will fill the gap in the natural reservoir line left the river channels. Sites are usually those that become empty storage capacity of a minimum value required place. The most economical arrangement is often a composite structure such as a masonry dam embankment by the side of the Earth. The current use of land were flooded should be dispensable.
Significant other engineering and engineering geology considerations when dams include:
Rock or soil permeability around
Earthquake disadvantage
Landslides and steady tilt
Flood peak flow
Reservoir sedimentation
Environmental impact on the river fisheries, forests and wildlife
The impact of human habitation
Compensation for flooded land and population resettlement
Toxic building materials and removal from the reservoir area proposed


 Let us show you more effects of dam working photos
 
River Dam Project Contractor Dam

Dam classification
 
1. According to the structure and mechanical characteristics can be divided into:
Gravity
Arch dam
Buttress dam
Prestressed dam
 
2. Press discharge conditions can be divided into:
 
Non-overflow
Overflow dam
 
3. Dam different materials can be divided into:
 
Embankment dam
Masonry dam
Concrete Dam
Rubber dam
 
4. Activities by dam can be divided into:
Fixed dam
Activities dam
 
Our Professional Design Team, Installation Group
with Rich Oversea Project Experience

 
River Dam Project Contractor Dam


Dear friends,

to provide you right dam information base on your site, welcome to contact us.

Thank you!  Welcome your inquiry and visit.

Send your message to this supplier
Avatar
Miss Grace
Manager
*From:
To: Miss Grace
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now